News Center

What are the measures for PPH tank construction?

2022-07-17 14:57:40
second

PPH Storage tank What are the measures for construction?

PPH storage tank It is mainly used to store chemical substances. The PPH storage tank we used at that time could not only store one chemical substance, but also frequently store different substances. But before replacing chemicals, we need to clean the PPH storage tank to prevent the reaction of previous chemical residues. PPH tank has been used for a long time. In order to ensure the stable use of PPH storage tank, we also need to clean and maintain PPH storage tank regularly.

PPH tank construction has the following measures:

1. Before construction, special personnel shall be assigned to supervise hot work and gas work tickets.

2. Please wear protective helmets when entering the construction site. Please fasten the protective belt when working at heights.

3. Foam fire extinguishers and other fire-fighting equipment shall be placed separately on the site.

4. PPH tank is forbidden to be used under pressure due to abnormal phenomena during pressure test. If there is abnormal sound during the test run, please stop the inspection.

5. The hoisting and commissioning shall be commanded by a specially assigned person, and multi head command is strictly prohibited.

6. During the lifting of PPH tank, irrelevant personnel are strictly prohibited from entering the site. No one is allowed to stand under heavy objects. The construction site shall be provided with protective net.

7. The power for the project needs to be connected by regular electricians, and it is strictly prohibited to connect power by irregular electricians.

8. This construction site is an extension of the plant area. It is strictly prohibited to collide with other equipment and process pipes during construction. Opening on the original pipeline or equipment must be approved before construction.

9. After long-term use, please refer to the storage requirements of PPH storage tank and clean the residual liquid in the tank in time.

10. When storing chemical liquid, first communicate with the manufacturer to determine the tank specification, such as thickened storage tank.

11. When the liquid inlet is higher than the tank bottom, the liquid inlet should bend to the tank wall to make the liquid flow along the tank wall, so as to reduce the liquid impact on the PPH mixing tank Direct impact of the bottom.

The above content is collected by the Internet, and the copyright belongs to the original author. If there is any infringement, please contact us to delete the content. Thank you!

 PPH winding tank

Recent browsing:

Related products

Qiheng Environmental Protection

Manager Liu: 19107778871


Address: Zone 1, Huangma Industrial Park, Qinbei District, Qinzhou, Guangxi


PPH storage tank PPH winding tank PPH mixing tank